William Vick's bequest and early proposals
The idea of building a bridge across the Avon Gorge originated in 1753 with the will of a Bristol wine merchant, William Vick, who left £1,000 to the Society of Merchant Venturers, stipulating that the money be invested until it reached £10,000, at which point it should be used to build a stone bridge across the gorge, free of tolls, between Clifton and Leigh Woods. By 1829 the fund had grown to around £8,000, still short of the target, but the industrial growth of Bristol and the increasing traffic between Clifton and Somerset lent urgency to the project.[1]
The Merchant Venturers realised that a stone bridge of the required length would cost far more than the fund could provide, and a wrought-iron suspension bridge seemed a cheaper alternative. Even so, the available sum was insufficient, and it was decided to seek an Act of Parliament permitting a toll bridge and to hold a public competition for the design. A first attempt to obtain the act failed in 1829, but the Clifton Suspension Bridge Company was eventually incorporated, with power to charge tolls.
Design competition
A design competition was announced in 1829, attracting 22 entries, among them proposals from Thomas Telford, the foremost bridge engineer of the day. Telford, serving as a judge, rejected all the submitted designs and then submitted one of his own, which was in turn criticised by the local committee; the competition was reopened. Isambard Kingdom Brunel, then just 24 years old and working as Telford's resident engineer on the Thames Tunnel, submitted designs for both a suspension bridge and a stone bridge. He was declared the winner in December 1830 through a second ballot of the judges, and was appointed project engineer.[2]
Brunel's winning design, described by the judges as showing "the most originality, with the most efficient application of power", envisaged an Egyptian-inspired structure, then fashionable after the Napoleonic-era fascination with Egypt. He subsequently revised the scheme, and after a false start caused by the Bristol riots of 1831, in which the project's promoter, the Bristol Institution, was caught up in the unrest, work finally began.
Construction
The foundation stone was laid on 21 June 1831 in the presence of Augustus, Duke of Sussex, but the Bristol riots of October that year frightened investors and dried up subscriptions for the project. Work was abandoned, and with the company in debt, little further progress was made until 1836, when funds had revived enough to allow the building of towers on both sides of the gorge and the sinking of a temporary wire rope across the gorge, from which a basket was slung to ferry workers and materials.[3]
Work proceeded slowly and intermittently, funded by the tolls on a temporary ferry and by further share issues. In 1843 the towers were completed and the ironwork of the abutments largely built, but money ran out entirely. That same year the company attempted to raise further capital by a public appeal, but the response was poor, and a proposal in the 1840s to complete the bridge using chains bought from the demolished Hungerford Bridge in London—an idea supported by Brunel—came to nothing. Work stopped, leaving only the towers and abutments standing, and the derelict towers made the gorge something of a local byword for unfinished ambition.
Brunel retained his affection for the project, reportedly calling the towers "my first child, my darling", and his original design drawings remained in his office. The scheme was briefly revived in 1851, but the necessary capital could not be raised.
Completion
Brunel died in 1859, and a renewed campaign began to complete the bridge as a memorial to him, led by the Institution of Civil Engineers and local notables. The shortfall in funds was met largely by buying and reusing the chains from Brunel's Hungerford Bridge across the Thames in London, which was being demolished to make way for a new railway bridge by the South Eastern Railway; the company sold the chains to the Clifton project, and a significant donation also came from wine merchant and Bristol interests in the port of Shanghai—with Chinese merchants there contributing £1,600.
The completion of the works was entrusted to the engineers William Henry Barlow and John Hawkshaw. They made some alterations to Brunel's design: the deck was made lighter and stronger using a warren truss arrangement, the towers were simplified, the chains were set in a different configuration, and the bridge was built with a single span between the towers rather than Brunel's side spans. The work was carried out by the contractor Messrs. Hennet and Co., and ironwork was supplied by the Butterley Company.
The bridge was opened on 8 December 1864, its completion having been delayed by gales. At the opening, a commemorative plaque was unveiled, and the road was opened to traffic; the inaugural crossing was marked by a procession and celebrations in Clifton.
Later history
In 1860, before completion, the bridge had been transferred from the Clifton Suspension Bridge Company to a body of trustees, under the Clifton Suspension Bridge (Clauses) Act. The bridge carried toll traffic from its opening and has never been free of charge for vehicles, the tolls being applied to maintenance. German bombing during the Second World War left the bridge unscathed, though a bomb fell nearby in the gorge.
The bridge has been strengthened and repaired several times. In 1925 a concrete slab deck was added to replace the original timber, and in the 1950s the bridge was strengthened to carry heavier motor vehicles, which it had not originally been designed for; in 1953, after an assessment of the chains, the Bristol city council imposed weight restrictions. In 1985 the bridge was closed while the deck was rebuilt with reinforced concrete, and new lighting and a strengthened carriageway were installed at a cost of around £2 million. Traffic lights were installed at both ends to control alternating flows.
The tolls have funded continuous maintenance by the trustees, and the bridge remains in daily use by pedestrians, cyclists and vehicles. In 2002, after concerns about the strength of the ironwork, further surveys and repairs were undertaken, and the bridge is inspected at regular intervals under the direction of the Clifton Suspension Bridge Trust, which continues to operate it as a self-financing charity.[4]